2026 Leuchtturm 1917 Monthly Planner with Notebook - INK Softcover
Couldn't load pickup availability
Monthly Planner with Notebook 2026
The Monthly Planner features a double-page spread for each month, with weeks listed horizontally underneath one another. The planner begins in November of the previous year, spans 16 months, and ends in February of the following year. Composition format has lined ruling for each day, whereas Paperback does not.
The notebook section can be found behind the planner and covers 138 pages. Boxes for crossreferences and page numbers link the Monthly Planner with the notebook.
- Composition B5 measures 7" x 10" | 178 x 254 mm
- Paperback B6+ measures 5" x 7.5" | 125 × 190 mm
- 138 numbered notebook pages with blank table of contents
- 1 November 2025 – 28 February 2027
- Overview 2025, 2026 and 2027
- Year planner Jan 2026 – Dec 2027
- Phases of the moon and international holidays
- Project planner
- Expandable pocket
- Detachable pages for notes
- 2 bookmarks
- Self-adhesive labels for archiving
- 80 g/m² acid-free paper
- High ink compatibility
- Imported
A family business since 1917, Leuchtturm operates under the belief that the enduring values of quality, workmanship and attention to detail make for good products and good business. We hope the quality and organizational features of this notebook will make life easier and more enjoyable.
Personalization Details
Planner notebook looks great personalized with embossing. Add your name or inscription to make it uniquely yours.
- Font: Goudy
- Size: 18 pt - 36 pt, depending on inscription length
- Color: Gold Foil
- Position: Lower right corner.
- Max: 2 Lines, up to 20 characters and spaces per line
- Special requests: Add a note to your order, we'll do our best to accommodate you