Moleskine PRO Project Planner

$ 40.95
Taxes, discounts and shipping calculated at checkout.

Map your tasks, reach your goals

Productivity experts know that breaking down a goal into smaller tasks is the way to get things done. The Moleskine PRO Project Planner is designed to help you do just that. Unlock the details of your project plans so you can keep your focus on the task at hand. 

The dates are left blank, to invite you to set long-term goals, identify motivation and document key milestones. There are yearly, 4-monthly, monthly and weekly sections for you to personalize and map your time, as well as a project progress section for structured notes and effective brainstorming. Whatever your projects or profession, the Pro Project Planner can adapt to your planning needs, leaving you to simply fill in the gaps.

The planner has three dedicated sections to help you achieve long term goals: inspiration, achievements, and findings

  • Large 5" x 8.25" | 13 x 21 cm | 288 pages
  • X Large 7.5" x 9.75" | 19 x 25 cm | 288 pages
  • A4 8.25" x 11.5" | 21 x 29.7 cm | 288 pages
  • Hard cover with rounded corners
  • Stickers included to personalize and flag your notes
  • Fold-out flap for key or index
  • Elastic closure
  • Matching ribbon bookmark
  • Ruled Pages: 70 gsm, acid-free, ivory
  • Expandable inner pocket in the back
  • The history of Moleskine is inside
  • Moleskine srl creates and sells FSC®-certified products

Personalization Details

Moleskine notebooks look great personalized with embossing. Add your name or inscription to make it uniquely yours.

  • Font: Goudy
  • Size: 18 pt - 36 pt depending on inscription length
  • Color: Gold foil embossing
  • Position: Lower right corner
  • Max: 2 Lines, up to 20 characters and spaces per line
  • Special requests: We can do the embossing blind (no color fill), and it can be in a different position if you prefer. Add a note to your order, we'll do our best to accommodate you

Click here to learn more about personalization

Add a Logo

Promote your brand with custom personalized journals and notebooks. We have lots of ways to showcase your design. Foil stamping, blind embossing, custom typesetting, title pages, and custom belly bands allow you to customize a notebook for your brand.

  • No minimums
  • Bulk discounts
  • One-time logo setup fee
  • Digital proofs and one-on-one consultation
  • Turnaround time is 1-3 weeks, rush is available
  • Our 100% guarantee

Click here to learn more about logo imprinting